GO Jiaju latest building materials information, the current introduction of the basic building materials used in the market construction paper gypsum board ceiling, let you have an understanding of this building materials, if you are interested, you can choose this building material during the decoration.
The gypsum board ceiling has light weight and good moisture resistance. No deformation, good flame retardant properties. Specifically divided into: water-resistant refractory gypsum board, high-density impact-resistant gypsum board and sound-proof gypsum board, etc., is the ceiling material commonly used in our interior decoration. So what are the construction techniques for the gypsum board ceiling? Together with the decoration network, let's take a look at it today.
First, the construction process
Raised ceiling level line → keel line → install pipeline facility → install main keel boom → install main keel → install secondary keel → install plasterboard → brush antirust paint → install bead → gypsum line installation
Second, the bullet ceiling height line
According to the level of the floor elevation, use the vertical vector to the ceiling design elevation, and the horizontal level of the ceiling along the wall and column.
Third, the keel line
According to the design requirements of the main and secondary keel spacing, the keel line is drawn on the level of the top level of the suspended ceiling.
Fourth, install the main keel boom
After playing the top level of the ceiling and the position line of the keel, determine the elevation of the lower end of the boom. According to the position of the main keel and the spacing of the hanging, the end of the bolt without the bolt thread and the floor burying rib (when the steel bar is not embedded) It can be fixed by welding joint with expansion bolts, and the anti-rust paint can be applied to the welding parts.
Fifth, install the light steel keel main keel
1. Fitted with a boom nut.
2. Install the hanging parts on the main keel.
3. The main keel of the hanging piece will be assembled. According to the position of the line, the hanging piece will be inserted into the corresponding boom bolt and the nut will be screwed.
4, the main keel meets the connection parts, pull the line to adjust the elevation, arch and straight.
5. Install the main keel in the installation hole, and set the connection card firmware according to the corresponding node structure of the atlas.
6, nailed to the side of the keel, fixed by nails. When the design is not required, the nail spacing is 1000 mm.
Sixth, install the main keel
Bend the end of the pre-embedded steel bar into a circular round hook, wear the No. 8 galvanized iron wire or fix the main keel with ф6, ф8 bolts. The expansion bolts can be used when the steel bars are not embedded, and the design elevation is guaranteed. The ceiling arching is designed according to the design requirements. When there is no requirement for the design, it is generally 1/200 to 1/300 of the room span.
Seven, install the secondary keel
1. Press the second keel line that has been bounced, and place the keel hanging piece.
2, hanging the secondary keel: according to the design of the secondary keel spacing, the secondary keel hanging on the main keel by hanging pieces, the design is not required, the general spacing is 500 mm ~ 600 mm.
3. When the length of the keel needs to be continued for a long time, use the secondary keel connector to connect the keel while hanging, and straighten it.
Eight, install paper gypsum board
1. The following preparations should be done before installation.
All keels have been adjusted; the lifting rods of heavy lamps, electric fans and other equipment have been arranged; the ventilation, water and electricity pipes in the ceiling and the pedestrian or safe passages in the ceiling of the people should be installed, the fire pipes are installed and commissioned; Lamp troughs, diagonal braces, scissors bracing, etc., should be properly arranged according to the project conditions.
2, laying direction
The gypsum board is installed at the end of the ceiling from the end of the ceiling, arranged one by one, and the remaining amount is placed at the final installation. The long side of the gypsum board is in a crisscross state with the secondary keel (parallel to the main keel). The overlapping width of the adjacent two gypsum board should be basically the same in the same keel, and a gap of about 3 mm should be reserved between the plates during installation.
3, paper gypsum board interface treatment
The cross keel must be installed at the interface of the board, and the board at the interface is not allowed to "hang".
4, seam processing
(1) Modulation of one-component caulking plaster putty
The container used for the preparation must be clean. Pour the clean water into the container according to the specified ratio, then slowly put the caulking gypsum powder into the water, let it swell for 5 minutes, then stir it into a slurry-like thick cake with a clean stir bar. In the prepared pulp, no more gypsum powder can be added to avoid agglomeration. Generally, the application time is 45 minutes. When it exceeds the time, it will start to solidify and cannot be used.
(2) edge processing
The longitudinal edge of the paper-wrapped board is not treated. The edge of the cut board should be treated as follows before the seam is installed: before the board is installed, the upper side of the front side of the cardboard is gently poured down, and after the board is fixed, the knife is used. The upper layer of the chamfered side paper is picked up and the picked-out facial tissue is torn off. It should be noted that the plaster core cannot be exposed, and this part still retains the lower layer of the facial tissue.
(3) Caulking process
Use a small scraper to evenly and satisfactorily insert the caulking putty into the slit at the lower part of the plate, so that the putty is extruded on the side of the back panel to form a protruding putty along the mouth, so that the edge of the panel and the putty putty are more firmly engaged. After the putty is completely dried, the caulking putty is smoothed with an electric or manual sander and No. 2 abrasive cloth. It can then be renovated with the entire plaster ceiling.
5, board installation and connection fixed
Gypsum board must be installed in a stress-free state to prevent forcible seating. Temporary support with wood support during installation, and the plate and the skeleton are pressed tightly, and the support can be withdrawn after the screw is fixed. When installing the fixing plate, it should be fixed from the middle of the plate to the four sides. It does not work at the same time. After fixing one piece, install another one in sequence.
(1) The distance between the fixed paper surface and the secondary keel
The fixed gypsum board should be flat-tipped self-tapping screws according to the keel. The self-tapping screws should not be less than 3 mm from the edge of the secondary keel.
(2) the distance from the edge of the board
The edge of the panel is 10 mm to 15 mm, and the edge of the panel is 15 mm to 20 mm. The self-tapping screw spacing is preferably 150 mm to 170 mm, and the screw should be perpendicular to the board surface. The nut should be slightly embedded in the surface of the plate by about 0.5 mm, so that the paper surface is not damaged. Exposed self-tapping screws end point anti-rust paint.
(3) Double-layer gypsum board installation
When installing double-layer gypsum board, the joint between the facing board and the base board shall be staggered and shall not be seamed on the same keel.
The above is the introduction of the construction technology of the gypsum board ceiling. A standard size ordinary gypsum board price is about 25 yuan - 30 yuan, the price is relatively low. But summer is the peak period of decoration, so raw materials may have a certain price up.
The article was compiled by Suzhou Building Materials. (Reprinted please indicate Suzhou Building Materials Network)
Recommend other related building materials
Yifeng Ceramics Royal Series Microcrystalline Stone
Jianya Hardware Pendant
Emperor door and window door
Advantages and features:
Automatic igniting and tempering control, high efficient and quick. Can be linear single, double - sided a molding groove cutting.
Brand: Buluoer intelligent
Other name: Gantry Flame Plasma Cnc Cutting Machine
Cutting mode: flame cutting, Plasma cutting
Suit material: carbon steel, manganese plate, galvanized plate, stainless steel, copper steel, aluminium plate etc. metal plate materials.
Product describe:
This CNC equipment is aimed at metal plate materials baiting, not only the appearance of atmospheric but also stable operating, high working efficiency, long service life and it can be achieved cutting all kinds of design graphic. Widely used in various machine building industry of metal sheet cutting.
Product features:
Bilateral drive, high transmission accuracy, operating is stability.
Frame aging treatment, stable structure and non-deformation.
Can remote operation, convenient and efficiency, save labour.
Automatic temper control, safety and efficiency.
Full-automatic StarCAM/ FastCAM graphical editing software, simple nesting.
Flame/plasma dual-purpose cutting system, easy to operate and wide application range.
System has self-compensating, automatic positioning, automatic height-adjustment, break-point memory and automatic recovery function.
Cutting size customization, flame plasma sub-cutting options.
Product parameters
Type |
BLDH-3060 |
BLDH-4080 |
BLDH-5080 |
BLDH-60100 |
BLDH-80100 |
Track gauge(mm) |
3000 |
4035 |
5000 |
6000 |
8000 |
Effective cutting width(mm) |
2300 |
3300 |
4300 |
5300 |
7300 |
Machine width(mm) |
3500 |
4300 |
5500 |
6500 |
8500 |
Track length(mm) |
6000 |
8000 |
8000 |
10000 |
10000 |
Number of standard cutting torch(set) |
1 |
2 |
2 |
2 |
2 |
Input power |
AC380V/50Hz;AC220V/50Hz |
||||
Lift(mm) |
200 |
||||
Cutting thickness(mm) |
Flame cutting:5-150 Plasma cutting:1-30(According to the power supply size) |
||||
Cutting speed (mm/min) |
Flame cutting:100-1000 Plasma cutting:450-5000 |
||||
Idle speed |
0-8000 |
||||
Drive mode |
Bilateral drive |
||||
System |
Shanghai Jiaoda or Beijing Starfire |
||||
Operating accurancy |
±0.5mm |
According to the power supply size |
|||||||
LGK-120IGBT |
LGK-200IGBT. |
||||||
No. |
Name |
Specification parameter |
Rrmark |
Specification parameter |
Rrmark |
||
1 |
Track gauge |
4.0m |
Transverse efffective cutting max. 3 m |
4.0m |
Transverse efffective cutting max. 3 m |
||
2 |
Track length |
8.0m |
longitudinal efffective cutting max. 6.5 m |
8.0m |
longitudinal efffective cutting max. 6.5 m |
||
3 |
Max. idle speed |
9000min |
|
9000mm/min |
|
||
4 |
Straight line position accuracy |
±0.2min |
|
±0.2mm |
|
||
5 |
Straight line position repeat accuracy |
±0.3mm |
|
±0.3mm |
|
||
6 |
Operating accurancy |
±0.5mm |
|
±0.5mm |
|
||
7 |
Height controller lift distance |
200mm |
|
150mm |
|
||
8 |
Flame punch cutting thickness |
6-80mm |
Carbon steel plate |
6-80mm |
Carbon steel plate |
||
9 |
Flama max. Cutting thickness |
200mm |
Carbon steel plate |
200mm |
Carbon steel plate |
||
10 |
Plasma punch cutting thickness |
16mm |
Stainless steel plate, carbon steel plate |
25mm |
Stainless steel plate, carbon steel plate |
||
11 |
Plasma max. Cutting thickness (Edge cutting) |
25mm |
Stainless steel plate, carbon steel plate |
40mm |
Stainless steel plate, carbon steel plate |
||
12 |
Inclination of plasma cutting surface |
5-8° (carbon steel plate) |
5-8°(carbon steel plate) |
|
|||
13 |
Roughness of plasma surface |
Ra12.5 |
Ra12.5 |
|
|||
14 |
Roughness of flame surface |
Ra25 |
Ra25 |
|
|||
15 |
Speed of plasma cutting |
50-4000mm/min |
50-4000mm/min |
|
|||
16 |
Speed of flame cutting |
50-700mm/min |
50-700mm/min |
|
|||
17 |
Drive mode |
Bilateral drive |
Bilateral drive (panasonic servo) |
|
|||
18 |
Number of cutting torch |
CNC flame cutting torch: 1, plasma cutting torch: 1 |
CNC flame cutting torch: 1, plasma cutting torch: 1 |
|
|||
19 |
Equipment accurancy |
Conformed or superior to ISO8206-1991, JB/T10045.3-1999 |
Conformed or superior to ISO8206-1991, JB/T10045.3-1999 |
|
|||
Flame plasma CNC cutting machine
Basic Equipment
No. |
Name |
Distribution |
Unit |
Quantity |
Remark |
1 |
Type specification |
BLDH4080 |
set |
1 |
Beam annealing |
2 |
Drive mode |
double-drive |
set |
2 |
Panasonic servo |
3 |
Drive reducer |
AEVELE |
set |
2 |
Taiwan |
4 |
CNC |
F2300TB |
set |
1 |
Shanghai Jiaoda |
5 |
FASTCAM |
Fast CAM Chinese version |
set |
1 |
Guoyou |
6 |
Flame cutting torch |
Wuxi Xiangzheng |
set |
1 |
Guoyou |
7 |
Plasma power |
Chengdu Huayuan LGK200 |
set |
1 |
Huayuan |
8 |
Arc voltage regulator |
Shanghai Jiaoda |
set |
1 |
system-provided |
9 |
Automatic ignite device |
Wuxi Xiangzheng |
set |
1 |
Guoyou |
10 |
Precision track |
24 kg |
m |
8*2 |
Wuxi |
11 |
Precision rack |
Straight tooth |
m |
6*2 |
Wuxi |
12 |
Pulley |
Nylon chain |
set |
1 |
|
13 |
Lift body |
2K2M |
piece |
2 |
|
Technical requriments
No. |
Name |
Distribution |
Remark |
1 |
Width of machine tool |
4000 |
|
2 |
Effective cutting wideth |
3100 |
|
3 |
Track gauge |
3710 |
|
4 |
Idle speed |
0~8000 mm |
|
5 |
Flame cutting thickness |
5~200 mm |
|
6 |
Plasma punch cutting thickness |
25mm |
user demand |
|
Plasma max. Cutting thickness |
45mm |
user demand |
7 |
Effective length |
6500 mm |
|
8 |
Cutting torch journey |
≤150 mm |
|
9 |
Accurancy |
± 0.5 mm |
|
10 |
Track length |
8m |
|
11 |
Input power |
AC220V/380V 50HZ |
|
12 |
automatic height-adjustment |
Jiaoda arc voltage height-adjustment |
|
13 |
Cutting material |
Stainless steel plate, carbon steel plate |
|
Cutting samples